---
title: Flowery Peak BEAD Project, Lyon County NV: Provisional
url: https://hdiss.net/data/bead/lyon-county/flowery-peak/
business: High Desert Internet Services (HDISS)
phone: 775-575-9593, 775-391-5660
email: info@hdiss.net
mailing_address: Home base: 200 S Virginia St, Suite 760, Reno NV 89501 (dispatch office, not a walk-in store). Mail: Billing Dept., PO Box 11353, Reno NV 89510
hours: Office open 9:00 AM to 5:00 PM, seven days a week. Network watched around the clock.
type: Fixed wireless internet service provider (homes and small businesses), web hosting, customer email, domain registration
service_area: Northern Nevada - Washoe, Lyon, Storey, Churchill and Douglas counties and Carson City; availability is checked address by address (line of sight to a tower)
plans: Bronze $50/mo up to 500 Mbps down, up to 200 Mbps up; Silver $75/mo up to 800 down, up to 200 up; Gold $99/mo up to 1 Gig down, up to 200 up; ask about the up to 1 Gig / 1 Gig ultra-low-latency service
no_online_purchase: true (check your address or call; existing customers pay at https://www2.fernley.net/hdiss/onlinepay/paymentform.cfm)
since: 2002
---

- [Home](https://hdiss.net/)
- [Northern Nevada data](https://hdiss.net/data/)
- [High Speed NV projects](https://hdiss.net/data/bead/)
- [Lyon County](https://hdiss.net/data/bead/lyon-county/)
- Flowery Peak

# Flowery Peak: a provisional High Speed NV (BEAD) project in Lyon County

Flowery Peak is a provisional High Speed NV (BEAD) project in Lyon County with 30 locations, about 116 thousand dollars in BEAD support and Hot Spot Broadband listed as the subgrantee in OSIT's Final Proposal data. Provisional means it could change and says nothing about any address in Lyon County. High Desert Internet is not a subgrantee.

Yerington and Mason Valley from the air. Photo: Ken Lund from Reno, Nevada, USA, [CC BY-SA 2.0](https://creativecommons.org/licenses/by-sa/2.0), via [Wikimedia Commons](https://commons.wikimedia.org/wiki/File:Yerington,_Nevada_(15083262223).jpg), cropped. [Photo credits](https://hdiss.net/photo-credits/)

## The project record

| Item | As filed in OSIT's Final Proposal data |
|---|---|
| Project | Flowery Peak (CM61-BEAD-NV-LYO-0911-0) |
| County | Lyon County |
| Subgrantee | Hot Spot Broadband |
| Technology (locations) | Licensed fixed wireless (30) |
| Locations | 30 |
| Anticipated speed per location | 1000/1000 Mbps, low latency |
| BEAD support | $116,080 |
| Subgrantee match | $39,505 |
| Estimated start / end | 10/1/2025 to 7/31/2028 |
| Priority broadband project | Yes |
| Intersects tribal land | No |
| Estimated fiber miles (aerial / buried) | 1 / 1 |
| Estimated jobs | 4 |
| Status | Provisional, subject to change |

Source: Nevada Office of Science, Innovation and Technology (OSIT), BEAD Final Proposal data files fp_deployment_projects.csv, fp_subgrantees.csv, fp_locations.csv, data files read 2026-10-15 (OSIT page last updated 2026-07-28). Provisional: the state plan approved by NTIA (announced January 8, 2026), subject to NTIA curing and NIST final review and award. Not a promise that any street will be built. High Desert Internet Services is not a subgrantee. Speeds are what the state file anticipates per location, not a measurement or a promise.

The file names Flowery Peak and files it under Lyon County; Dayton is the nearest town page here. Closest on this site: the [Dayton page](https://hdiss.net/service-area/dayton/). The Flowery Peak record is short, so this page sets it beside the other Lyon County projects and explains the words in it.

## What does the state's record say about Flowery Peak?

The file counts 30 locations in the Flowery Peak project and names Hot Spot Broadband, which is how OSIT's Final Proposal data words it: Hot Spot Broadband is listed as the subgrantee for Flowery Peak. The technology for every one of the 30 locations is licensed fixed wireless. The file anticipates up to 1000/1000 Mbps per location for Flowery Peak. BEAD support is about 116 thousand dollars, and the subgrantee match is about 40 thousand dollars, which puts the filed total at about 156 thousand dollars.

The schedule in the file for Flowery Peak is an estimate: a subaward on September 3, 2025, performance starting October 1, 2025 and ending July 31, 2028, a span of about 2.8 years.

The file marks Flowery Peak a priority broadband project.

## What does provisional mean for Flowery Peak?

The approval behind Flowery Peak has two steps left. NTIA approved Nevada's revised Final Proposal and the state announced it on January 8, 2026, but the awards, the Flowery Peak one among them, stay subject to NTIA curing and NIST final review and award. Until then OSIT lists each project as provisional.

The practical reading for the Flowery Peak project: Hot Spot Broadband is the listed subgrantee today, 30 locations is today's count, and neither is final. No page on this site, and nothing in the Flowery Peak file, says that a particular home will be reached.

## What would licensed fixed wireless mean for the 30 locations?

The technology field for Flowery Peak reads licensed fixed wireless for every location. In plain terms that is a radio link to an antenna on the building, backed by an estimated 1 mile of aerial and 1 mile of buried fiber and 4 estimated jobs.

The anticipated speed of up to 1000/1000 Mbps per location in Flowery Peak is the state's planning figure, not a measurement and not an offer to a household. High Desert Internet also sends internet by radio from towers, under its own arrangements and outside the Flowery Peak project.

## How does Flowery Peak compare with the other projects in Lyon County?

OSIT's file lists 9 projects in Lyon County with 512 locations in all, Flowery Peak among them. At 30 locations, Flowery Peak is the 5th largest, about 6 percent of the county's filed locations.

The other licensed fixed wireless projects the file lists in Lyon County besides Flowery Peak: Occidental Grade (6). Hot Spot Broadband is also listed, besides Flowery Peak, as the subgrantee for Fernley, Stockton Flat Well, Occidental Grade.

Across the six counties' file, 10 projects including Flowery Peak use licensed fixed wireless. Dividing BEAD support by locations gives about 3,900 dollars per location for Flowery Peak, against about 3,400 dollars at the low end and about 22,000 dollars at the high end for that technology, which puts it number 3 of 10 on that measure. That Flowery Peak ratio is arithmetic on the file's numbers, not a statement about cost or value.

## What should someone in the Flowery Peak project area do while it is provisional?

The Flowery Peak file is a plan, so a home near it has no reason to hold off. Look up the address on the FCC's National Broadband Map at broadbandmap.fcc.gov, compare what providers report, and keep whatever service works while the Flowery Peak plan moves.

For a different kind of option near Flowery Peak, High Desert Internet works by fixed wireless from towers, a radio link that needs a clear path to the roof; its plan cards are below this Flowery Peak record.

For a home near Flowery Peak, use the [address check](https://hdiss.net/check-availability/) or call 775-575-9593, 9 to 5 every day. A person looks at the path from the nearest tower to the roof and calls back; if it looks clear, a technician confirms it at the house, and that answer is for one address, not for the Flowery Peak project.

### Sources

- [osit.nv.gov/siteassets/osit.nv.gov/content/broadband/bead/fp_deployment_projects.csv](https://osit.nv.gov/siteassets/osit.nv.gov/content/broadband/bead/fp_deployment_projects.csv) (Nevada OSIT BEAD Final Proposal data, project CM61-BEAD-NV-LYO-0911-0, read 2026-10-15)
- [osit.nv.gov/siteassets/osit.nv.gov/content/broadband/bead/fp_locations.csv](https://osit.nv.gov/siteassets/osit.nv.gov/content/broadband/bead/fp_locations.csv) (technology per location, read 2026-10-15)
- [osit.nv.gov/siteassets/osit.nv.gov/content/broadband/bead/fp_subgrantees.csv](https://osit.nv.gov/siteassets/osit.nv.gov/content/broadband/bead/fp_subgrantees.csv) (subgrantee list, read 2026-10-15)
- [broadbandusa.ntia.gov/sites/default/files/2026-01/BEAD_FP_Overview_NV.pdf](https://broadbandusa.ntia.gov/sites/default/files/2026-01/BEAD_FP_Overview_NV.pdf) (NTIA BEAD Final Proposal Nevada Overview, January 2026)
- [hdiss.net/services/](https://hdiss.net/internet-plans/) (High Desert plan cards, read 10/15/26)

### Talk to a person

- Call [775-575-9593](tel:7755759593) [775-391-5660](tel:7753915660) Open 9-5 every day
- Email [info@hdiss.net](mailto:info@hdiss.net)

[Check my address](https://hdiss.net/check-availability/#check)

### Related

- [High Speed NV (BEAD) projects in Lyon County](https://hdiss.net/data/bead/lyon-county/)
- [Internet in Lyon County](https://hdiss.net/service-area/lyon-county/)
- [Internet in Dayton, NV](https://hdiss.net/service-area/dayton/)
- [Internet access in Lyon County, by the numbers](https://hdiss.net/data/lyon-county/)
- [BEAD](https://hdiss.net/glossary/bead/)
- [What Nevada's High Speed NV build-out means for rural roads](https://hdiss.net/guides/high-speed-nv-bead-rural-roads/)
- [Check my address](https://hdiss.net/check-availability/)
- [Fernley: High Speed NV project in Lyon County](https://hdiss.net/data/bead/lyon-county/fernley/)

Local since 2002

Fixed wireless from towers in Northern Nevada. Three plans, no contracts, local support, 4.8 on Google from 36 reviews.

[About High Desert](https://hdiss.net/about/)

## Questions people ask

### Does the Flowery Peak listing mean my street will get licensed fixed wireless?

No. The file counts locations in the Flowery Peak project area and the status is provisional. It does not name streets near Flowery Peak and this page does not either; the FCC map and the subgrantee are the places to ask about an address.

### Who is the subgrantee for Flowery Peak, and is it High Desert?

OSIT's data lists Hot Spot Broadband. High Desert Internet is not a subgrantee and has no part in Flowery Peak.

### What start date does the file give for Flowery Peak?

Only estimates for Flowery Peak: start October 1, 2025, end July 31, 2028. Treat them as subject to change.
