A visit goes smoother when the person arrives to an open gate and a clear wall. None of this is required of you in the agreement beyond reasonable access, but it saves time and avoids surprises.
Takeaways
- Be home and make the property reachable.
- Pick your router spot before the visit.
- Mention trees, steep roofs, locked gates and dogs when you book.
- Keep your current service on until the new one is confirmed.
What does the agreement ask of you?
The HDISS Service Agreement says the customer provides reasonable access to the premises and adequate work space, and makes the premises free of hazardous material and dangerous conditions before the work, with asbestos named as an example (section 11.A). It also says the customer is responsible for provisioning, configuring and maintaining customer equipment, such as routers (section 8). In plain terms: let the technician reach the work areas and know what you are connecting inside the house.
What should you clear or fix ahead of time?
If a roof is new, steep, tile or metal, say so when you book. The technician can plan for it.
- The outside wall and roof edge where the antenna may go: move ladders, planters and stored items.
- Gates: unlock them or tell the office the code or who to call.
- Pets: put dogs inside for the visit, and tell the office if there is a dog in the yard.
- The indoor spot for the injector and router: near an outlet, in the open, ideally central.
- A path inside from the cable entry to that spot: clear the shelf or the closet floor.
- Vehicles: leave the driveway or the yard approach open.
How do you choose the router spot?
Pick a place near the middle of the house, off the floor, with room around it. The cable that feeds the router arrives from the outdoor antenna, so the route decides how close you can get. Tell the technician what you want and listen to what is practical. A central spot with a longer cable is often better than a closet next to the wall where the cable comes in. The router placement guide goes through the reasons.
What should you tell the office?
Tell them anything that may affect the path or the access: tall trees on the side facing the road, a hill behind the house, a metal roof, a second building where you will also want service, a tenant, and whether the house is a manufactured home. The company does not publish a list of what is allowed, so these are questions to ask rather than rules. If you have a landlord or an HOA, ask permission first; see landlords, HOAs and the OTARD rule. For a second building, read add a second building.
What stays running until the new service works?
Your old internet. Do not cancel until the new connection is working and you have tested it. The cable switching steps, the satellite steps and returning old provider equipment cover the other end. If the path turns out to be blocked, you will want the old line.
What do you bring on the day?
High Desert does not publish how long the visit takes, so keep the afternoon loose.
- A way to pay the day-one charge. See what you pay on day one and ask the office which payment methods they accept.
- Your router and its login, if you have your own.
- A list of the devices that need to join the network.
- The Wi-Fi name and password you want, written on a card.
What if you still have questions?
Call 775-575-9593 any day from 9 to 5. If you have not yet sent an address, use the address check; a person looks at the path from the nearest tower and calls you back. A technician confirms the path at your house before work begins. Never climb to the roof yourself to check the spot; leave that to the technician.
Sources
- hdiss.net/terms-of-use/ (HDISS Service Agreement V 1.12, read 10/15/26)
- hdiss.net/services/ (High Desert plan cards, read 10/15/26)
